July 2, 2018
We removed the remaining baulks from the trench this week, allowing us to clarify a number of important features.
June 20, 2018
We began drawing the faces of the baulks to record the vertical stratigraphy of the site this week.
June 13, 2018
We began to remove the stone collapse this week to reveal the structure of the building, an exciting process.
June 11, 2018
Our task this week involved cleaning back the topsoil, and the form of Building 24 is already visible.
June 4, 2018
The first week this season with a big group of students, the team began work at the site of AAFS’ first excavation at Keem Bay.
June 1, 2018
Preparing for our first excavation of the season at Keem Bay, we also finished survey work at Caraun Point.
May 16, 2018
This week was dedicated to surveying at Caraun Point, the site of a multi-period archaeological complex on the tip of a sand-covered peninsula.
May 4, 2018
The sixth season of work at the Keem Bay settlement begins at the end of May.