August 16, 2013
Room 8 The excavation of this room was completed this week. Room 8 has a fine floor of large limestone slabs (fig. 1) and plastered walls (fig. 2). A great […]
August 1, 2013
Room 7 The excavation here reached the ground floor (fig. 1), while also revealing the door opening (fig. 2) to Room 8. Both have very large limestone slabs, which indicate […]
July 25, 2013
Room 6 Room 6, being at the eastern end of corridor 21 is another short corridor, though not aligned with it. The excavation has revealed the corner formed by the […]
July 18, 2013
Room 6 This is a small corridor at the east end of Room 21, another corridor. The excavation of this room aims at understanding their relation better, as they are […]